Abbasian Hosseini, S A (2015) Social and engineering aspects of construction site management using simulation and social network analysis, Unpublished PhD Thesis, , North Carolina State University.

Abudayyeh, O Y (1991) An automated data acquisition and data storage model for improving cost and schedule control, Unpublished PhD Thesis, , North Carolina State University.

Al-Ibrahim, A (2006) Optimizing roof maintenance and replacement decisions, Unpublished PhD Thesis, , North Carolina State University.

Alsharef, A F A (2022) Leveraging data analytics to improve construction operations and occupational safety, Unpublished PhD Thesis, , North Carolina State University.

Arocho Rosa, I d M (2015) The impact of transportation construction projects and activities on emissions, Unpublished PhD Thesis, , North Carolina State University.

Attia, T M (2002) The impact of communication technologies on group problem-solving performance in construction, Unpublished PhD Thesis, , North Carolina State University.

Bai, Y (1996) Planning and control model for robotic bridge painting, Unpublished PhD Thesis, , North Carolina State University.

Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes, Unpublished PhD Thesis, , North Carolina State University.

Becker, T C (2012) Improving the predictability of construction project outcomes through project level indirect construction cost practices, Unpublished PhD Thesis, , North Carolina State University.

Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning, Unpublished PhD Thesis, , North Carolina State University.

Choi, B (2003) Topics in risk-based design and performance evaluation of structures, Unpublished PhD Thesis, , North Carolina State University.

Dorr, E E (1979) Economies of scale in high school construction and operation, Unpublished PhD Thesis, , North Carolina State University.

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects, Unpublished PhD Thesis, , North Carolina State University.

Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems, Unpublished PhD Thesis, , North Carolina State University.

Javanmardi, A (2019) Strategies and predictive models for reducing workflow variability in construction production systems, Unpublished PhD Thesis, , North Carolina State University.

Kranz, C N (2021) Optimizing compost incorporation for stormwater infiltration, runoff quality, and vegetation establishment in post-construction soils, Unpublished PhD Thesis, , North Carolina State University.

Lee, D (2023) Development of a real-time automated mobile robotic welding system in construction, Unpublished PhD Thesis, , North Carolina State University.

Lee, J (2005) Value analysis of Wi-Fi agent functions in construction, Unpublished PhD Thesis, , North Carolina State University.

Namian, M (2017) Factors affecting construction hazard recognition and safety risk perception, Unpublished PhD Thesis, , North Carolina State University.

Noghabaei, M (2021) Visual and behavioral data analysis in immersive virtual environments for enhancing construction safety, planning, and control, Unpublished PhD Thesis, , North Carolina State University.

Nuntasunti, S (2004) The effects of visual-based information logistics in construction, Unpublished PhD Thesis, , North Carolina State University.

  • Type: Thesis
  • Keywords: competition; security; trust; construction project; collaboration; communication; logistics; monitoring; productivity; safety; training; critical success factor
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305165781
  • Abstract:
    The construction industry has, for sometime, suffered from stagnant productivity, high accident rate, project delays, and poor quality. Research studies have shown that the major cause of these performance problems is the lack of effective communication. This research was launched to investigate the usefulness of a comprehensive information logistics model on construction process performance. In order to test and validate key components of the model, a prototype network system named Visual-based Integrated Wireless Site (V-IWS) was developed and tested on a mid-size building construction project. The system was designed to allow every project participant access to real-time visual images of the jobsite and share information interactively with each other as well as with a central database through the Internet. It was developed and evaluated for 7 months in 2003. During the same time, the communication channels adopted by the general contractor, R. N. Rouse, and on-site meetings were observed and analyzed. This analysis indicated that most of the information shared among participants of this project could be handled electronically by the V-IWS. It was demonstrated that the V-IWS: (a) reduces production waste and non value-added activities such as material delivery time, (b) eliminate the need for unnecessary site visits and meetings, (c) adds significant value to project participants by automatically creating visual as-built and picture archives, (d) provides operational how-to training for crew, and (e) increases site safety and security through automated monitoring. The system is scaleable and more network devices can be added as the building grows. While this study proved technical feasibility of the V-IWS, it became evident that trust, collaboration and information sharing among participants were critical success factors. Due to the industry's traditional low-bid competition and aversion to change, it is crucial to understand how costs and benefits be distributed. Value sharing as well as technology adoption process need to be studied in order to ensure successful implementation of the system.

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry, Unpublished PhD Thesis, , North Carolina State University.

Piper, B E B (2014) Optimization methods for improving the resilience of civil infrastructure systems subject to natural hazards, Unpublished PhD Thesis, , North Carolina State University.

Rihani, R A (2006) An investigation of critical success factors for robotic masonry, Unpublished PhD Thesis, , North Carolina State University.

Russell, M M (2013) Allocation of time buffer to construction project task durations, Unpublished PhD Thesis, , North Carolina State University.

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry, Unpublished PhD Thesis, , North Carolina State University.

Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks, Unpublished PhD Thesis, , North Carolina State University.

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology, Unpublished PhD Thesis, , North Carolina State University.